Central Receiving / Container Operations Facility

Fleet and Industrial Supply Center, Pearl Harbor, Hawaii

  • Performed a comprehensive geotechnical exploration during design to develop foundation engineering and pavement design recommendations for the construction of a 58,000 square feet single level, warehouse building with a mezzanine, and a loading dock pit with 8 docking positions for container vans and trucks.
  • This project included the extensive testing and reuse of existing �Raymond� Step-taper pile foundations for Building 476 that formerly occupied this site and select new piles to support the new building.
  • Developed a cost effective non-destructive testing program to re-use the �Raymond� step-taper piles.
  • PCAS during construction have helped the designers and NAVFAC Pacific develop an economical and practical way to design and construct this building within budget.